-
-
- Funding gap
- -
- Runway at current pace
- -
- Required pace
- -
- At the checkpoint
- -
- Slack / shortfall
- -
- Current pace
- -

Compare current treasury, the heir buffer, monthly net income and the working horizon before a risky transition.
Every number is an editable scenario. The primary source defines only the current game context.
-
Separate mercenaries, gifts, factions and one transition shock.
Use flow after raised troops and other commitments, not the best peaceful month.
The same future income cannot both repay construction and build the succession reserve.
Paradox Interactive / Steam · Current primary source ↗The full guide explains which inputs must stay separate, how to run the adverse case and what to change first when the runway fails.
Read the complete guide →The playbook shows what has been checked, which layer comes next and where the decision becomes action.
The planner shows positive slack at the selected checkpoint.
Check whether the same future income is funding both construction and the heir buffer.
Open next step →